Case Studies

Canterbury Park Turf Enhancement

Canterbury Park’s one-mile, 14-acre turf track is critical for horse safety and national broadcast presentation. When Kevin Cole stepped into the turf manager role in 2019, he faced the challenge of maintaining a high-performance racing surface without deep turf experience.

In addition to the track, another 14 acres required consistent playability, strong root development, and a clean, professional appearance under televised conditions. The need was clear: build a sustainable program backed by trusted expertise.

Canterbury 1

MnDOT Highway 52/I-90 Coir 700 Channel Stabilization

On a MnDOT project along the Highway 52/I-90 corridor, Evergreen Companies installed a natural coir turf reinforcement system designed to stabilize a newly shaped channel while supporting long-term vegetation establishment. Ramy Turf Products supplied the seed, Coir 700 turf reinforcement mat, and Falcon helical pins needed to help the project move forward with confidence.

Mndot Highway Coir 700